From Design Details To Final Budget: Understanding MEP Estimating
  A design team finalized the ductwork routing without checking it against the electrical conduit already modeled in the same ceiling space. The conflict was not found until installation started. The duct had to be rerouted, the conduit moved, and the ceiling grid redesigned on-site. None of these extra costs were included in the original budget because each trade was estimated separately...