-
2 Beiträge
-
0 Fotos
-
0 Videos
-
Male
-
30/07/2006
-
Follower 0 Menschen
Neueste Updates
-
From Design Details To Final Budget: Understanding MEP EstimatingA design team finalized the ductwork routing without checking it against the electrical conduit already modeled in the same ceiling space. The conflict was not found until installation started. The duct had to be rerouted, the conduit moved, and the ceiling grid redesigned on-site. None of these extra costs were included in the original budget because each trade was estimated separately...0 Kommentare 0 Geteilt 36 Ansichten 0 BewertungenBitte loggen Sie sich ein, um liken, teilen und zu kommentieren!
-
Why 3D Floor Plan Rendering Is Valuable For Architects And Property DevelopersA property developer marketed 40 apartment units using standard 2D floor plans. Potential tenants visited the property, but some changed their minds after seeing the actual layout. The flow between the kitchen and living room was not clear from the flat plan. Leasing slowed down for several weeks. The developer then added a 3D floor plan rendering. Tour-to-lease conversion improved soon after...0 Kommentare 0 Geteilt 40 Ansichten 0 Bewertungen
Mehr Storys